    Hosting Maintenance

    Just to let you know that my hosting servers are doing an upgrade on Saturday night... It shouldn't cause us any issues, but I wanted to let you know anyway Just in case!

    I've copied the times below for you!

    Hello,

    To maintain power supply efficiency and reliability, a high voltage transformer at our Manchester, UK datacentre facility is being upgraded during a scheduled maintenance window on 19th October 2019.

    This work necessitates isolating the mains power supply to the data centre, and therefore power load will be transferred to UPS protected generator power for its duration.

    Additional standby backup generator capacity will also be in place should it be required.

    Start: 08:00 BST (UTC +0100), Saturday, 19 October 2019
    End: 20:00 BST (UTC +0100), Saturday, 19 October 2019

    No customer impact is expected during these works. This notice is for information only.

    Thank you for your patience during this essential maintenance work.

    Regards,
    Engineering Team
    Please always remember that I am always right. I have a framed certificate to prove it.

    When in doubt, stop and think... WWSS? (What Would Suzi Say?)
    For more info please see
    THIS thread


  2. The Following 3 Users Say Thank You to Suzi For This Useful Post:

    Angie (18-10-19),OldMike (23-10-19),Paula (18-10-19)

  3. #2
    Boss Lady ;) Suzi's Avatar
    Join Date
    Feb 2012
    Location
    Surrey. UK
    Posts
    82,968
    Just so you are aware, they are doing the next step this Saturday night...

    Further to the recent power supply maintenance window last Saturday, an additional maintenance window has been scheduled to complete the works this Saturday, 26th October 2019.

    This work necessitates isolating the mains power supply to the data centre, and therefore power load will be transferred to UPS protected generator power for its duration.

    Additional standby backup generator capacity will also be in place should it be required.

    Start: 08:00 BST (UTC +0100), Saturday, 26 October 2019
    End: 20:00 BST (UTC +0100), Saturday, 26 October 2019

    No customer impact is expected during these works. This notice is for information only.

    Thank you for your patience during this essential maintenance work.
    Please always remember that I am always right. I have a framed certificate to prove it.

    When in doubt, stop and think... WWSS? (What Would Suzi Say?)
    For more info please see
    THIS thread


  4. The Following 3 Users Say Thank You to Suzi For This Useful Post:

    Angie (23-10-19),OldMike (23-10-19),Paula (23-10-19)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •